Timeline view will allow you to show the duration and current status of your projects in a big picture. Timeline view is the third view of Projectrak. Access to the project navigator and then go to Timeline tab:
Chose the timeline unit
Choose the unit in which you want the timeline to be displayed:
Move in time
Move to the future and the past using the arrows in the upper right-hand corner, and return to the current time by clicking on Today.
Understanding the Timeline view
Item | Description |
---|---|
At left you have projects located, and you can order them by its name. | |
For each project, you can see a bar in the timeline depending on:
It is not possible to configure the dates you are showing. If you are using other dates, please, use Start date and End date predefined fields. | |
If your project just have one date filled, you will see a gradient at the beginning to the end | |
The bar colour will depend on the Status field, by default (if you don't have modified it) next colours: | |
If the project has no value in the status field, you will see the white bar. | |
When you have chosen week as unit, you could have two kind of vertical lines:
| |
An orange vertical line will indicate the current day |
Mouse and trackpad behaviours:
Move timeline to the future or past
- Click and drag to move the timeline
- With trackpad, use two fingers left and right
- With mouse and keyboard: Shift + mouse wheel
Zoom (See more time or less time at the future and at the past at the same time)
- Option + mouse wheel
- Option + trackpad with two fingers up and down
Create new bar
- Double-click on an empty line → COMING SOON
Change dates
- Drag the bar at the beginning or at the end → COMING SOON