Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Total remaining estimate in unresolved issues

Example

Image Removed
Image Added

Total time spent in closed issues

Example

Image Removed
Image Added

Incurred cost

Pre-requisites

  • Create another Formula field with the issue's Total time spent (See example above)

Example

Image Removed
Image Added
Info

field_1000 is the code of our Total time spent. Please check your ID and configure the expression with your ID


Remaining budget

Pre-requisites

  • Create a Number field with the project Budget

  • Create a Formula field with the project Incurred cost (See example above)

Example

Image Removed
Image Added
Info

field_1000 is the code of our Budget. Please check your ID and configure the expression with your ID

field_2000 is the code of our Incurred cost. Please check your ID and configure the expression with your ID


Remaining time

Pre-requisites

  • Create a Duration field with the project Original estimate

  • Create another Formula field with the issue's Total time spent (See example above)

Example
Image Modified

Info

field_1000 is the code of our Original estimate. Please check your ID and configure the expression with your ID

field_2000 is the code of our Total time spent. Please check your ID and configure the expression with your ID


Number of issues

Example

Image Removed
Image Added

Blocking bugs in QA

Example

Image Removed
Image Added


Info

Replace the query with the values that match your configuration.



Pro tip

When trying to know what is the ID of a Projectrak custom field ID, you just need to check de ID column. Please see the screenshot for reference. 
Image Modified